Park Avenue

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Park Avenue, located just outside the Downtown area, extends from Ferndale Avenue to Monroe Street. The corridor is defined by a high density of residential housing and pedestrian activity characteristic of a multimodal neighborhood street. A study was completed in Fall 2024 to assess the corridor using the Town’s 2024 Standards for Traffic Calming and Crosswalks. Preliminary results from this study indicated the following needs:

      • Improvement of pedestrian accommodations such as crosswalks, clear sidewalks, and visibility.
      • Introduction of traffic calming elements.
      • Improved roadway striping to aid in establishing parking areas, sight distance, and pedestrian areas.

A community meeting was held on April 21, 2025. Staff met with local residents to gather community feedback on the study results and concept alternatives under consideration.

Use the links to view the slide presentation and summary of meeting notes.

ParkAVE

publicworks@herndon-va.gov

(703) 435-6853